The Project

Near Leith on Georgian Bay

Phase 1 - new roof installed

Orig-1.jpg (301987 bytes) Orig-3.jpg (273785 bytes) Orig-4.jpg (193517 bytes)

Phase 2 - new windows installed

Win-1.jpg (251619 bytes) Win-2.jpg (256504 bytes) Win-3.jpg (201457 bytes) Win-4.jpg (156022 bytes)

Phase 3 - exterior re-insulated, sealed with Typar and re-sided

Siding-Work.jpg (270061 bytes) Win-5.jpg (202483 bytes) Siding-done.jpg (199412 bytes) Siding-done-2.jpg (220307 bytes) Siding-done-3.jpg (225051 bytes) Old-New-1.jpg (393932 bytes) Old-New-2.jpg (426032 bytes)

In the middle of Phase 3 Hurricane Sandy made her presence felt and took out 6 trees, 2 of them were really large and required professional tree removal

Sandy-1.jpg (323929 bytes) Sandy-2.jpg (322365 bytes) Sandy-3.jpg (326001 bytes) Sandy-4.jpg (280829 bytes) Sandy-5.jpg (264011 bytes) Sandy-6.jpg (346728 bytes) Sandy-7.jpg (374146 bytes)

Phase 4 & 5 - Change over from private well to municipal water, and a new 200 amp underground electrical service at the same time.

Powerline-Trench.jpg (297903 bytes) pwt-1.jpg (360799 bytes) pwt-2.jpg (304616 bytes) pwt-3.jpg (294456 bytes) pwt-4.jpg (295688 bytes) pwt-5.jpg (255832 bytes) pwt-6.jpg (284361 bytes) pwt-7.jpg (296044 bytes) pwt-8.jpg (249611 bytes) pwt-9.jpg (257414 bytes)  

Phase 6 - Renovate all of the 1st floor interior (2nd floor done 10 years ago) including all new wiring and HVAC system. The sun room was done in the fall, all furniture is moved in there and the rest is underway

Sunroom Fall-1.jpg (103527 bytes) Fall-2.jpg (125523 bytes) Fall-3.jpg (117067 bytes) the rest Interior-1.jpg (194322 bytes) Interior-2.jpg (229058 bytes) Interior-3.jpg (216001 bytes) Interior-4.jpg (208259 bytes)

Phase 7 - Spring of 2013 - new deck on waterfront side of house

Phase 8 ........  the unexpected - 10.3 acres across the road - timing & location are everything! 